top of page

1201 Woodward - Detroit, MI

This Historic Buildings includes multi-purpose build-outs with modern amenities while maintaining the Downtown Detroit Architecture.

PCP played an integral part in the complete restoration of delapidated ornamental plaster systems.  Our Plasterer Technicians cleaned and prepped what remained of existing surfaces, applied molding compounds, poured new molds, attached the bolds, and blended new and old together, creating an amazing transformation from past to future.


PCP also completed the remaining 95,400 sf restoration of the building through modern methods, building out over 15 floors with conventional drywall and finishing methods.


General Contractor:

The Christman Company


Owner:

Bedrock Real Estate Services


Architect:

Kramer Design Group


Location:

Detroit Michigan


Completion Date:

2015

Project Scope

  • Acoustical Ceilings

  • Cold Formed Framing

  • Densglass Sheathing

  • Doors, Frames & Hardware

  • Drywall Taping & Finishing

  • Metal Studs

  • Plywood Sheathing

  • Shaftwall

  • Plaster Restoration and Molds

Our Projects

We have the "know-how" you need.

 
bottom of page