Project Name: Northwest Airlines - World Gateway Midfield Terminal
Location: Romulus, Michigan
The Northwest World Gateway at Detroit Metro Airport opened February 24, 2002. This is PCP’s largest project in the history of PCP. This terminal is a work of art inside and out. From the exterior, the curving metal roof symbolizes wings and flight. Inside, the high-arched ceilings make the interior open and spacious. The facility provides travelers with easy access to a wide variety of shopping and restaurant options before or between flights.
Project Data |
Value of our Work: |
$36 Million |
Completion Date: |
Spring 2002 |
Length: |
1 Mile long |
Length of Walls Installed: |
30 Miles |
Sq Ft of Drywall: |
2.5M |
Sq Ft of Ceilings: |
1.5M |
Manhours Used: |
300,000 |
# of Field Personnel at Peak: |
170 |
|
PCP Scope of Work:
- Interior wall & soffit metal framing
- Drywall hanging and taping
- Perforated ceiling systems
- Acoustical ceiling systems
- Specialty ceiling systems
- Exterior framing & sheathing
- Exterior metal panel systems
- Doors/frames and hardware installations
- Special scaffolding systems
|
|
|